The new 12,014 SF reclaimed water facility was designed with the capacity to produce one million gallons of reclaimed water per day.
The new building houses a micro-filtration membrane system, ultraviolet radiation system, pumping and piping systems, and chemical facility. The project also included a precast concrete water storage tank, yard utilities, roadways, plumbing, heating, ventilating, air conditioning, building automation systems, lighting, and an electrical system associated with the building and processing system.
4,000-line feet buried pipeline connecting the reclaimed water facility and the central utility plant was installed across the campus, and included a pipeline for irrigating adjacent Sherman Field.