This project consisted of the renovation of two spaces – the catheterization lab (special procedures room) and a CT scan/ultrasound suite. The catheterization lab project included a complete renovation of an existing prep room into a new 700 SF special procedures room. This room is used as both a catheterization lab and a pacemaker installation room. It houses the latest technology from Siemens. O&G was able to complete this project without incident or disruption to the existing, operational catheterization lab which is connected by a common control room.
The CT scan/ultrasound project included renovation and conversion of existing space to house a second CT scanner and a new ultrasound suite. This work was performed without interruption to the adjacent CT scanner and ultrasound areas which remained fully operational.
Additional projects O&G performed for St. Mary’s Hospital include a doctor’s lounge fit-out, bariatric unit renovations, and the $.5 million Naugatuck Valley Surgical Center renovation in Naugatuck.