I-84 Safety and Operational Improvements in West Hartford

Client

Services

Size

Value

PROJECT Details

The recently completed I-84 Reconstruction Project in West Hartford represents a significant infrastructure improvement aimed at enhancing safety and reducing congestion along a critical two-mile stretch of highway. Delivered under a Design-Bid-Build model, the project focused on comprehensive roadway reconstruction, including milling and paving to correct cross-slopes and roadway profiles. These improvements were executed with precision using mobile laser scanning and shim paving techniques.

Key components of the project included roadway widening, full-depth reconstruction, guardrail and precast barrier curb installations, lighting and Incident Management System (IMS) enhancements, drainage upgrades, and noise barrier wall construction. The scope also involved complex bridge work, such as superstructure replacements, bridge widenings, and full bridge demolitions and replacements.

O&G partnered closely with the Connecticut Department of Transportation, BL Companies and Urban Engineers to bring this critical project to life. The team’s seamless coordination from conceptual design through construction allowed for the successful navigation of technical and logistical challenges. A strong emphasis on collaboration, responsiveness, and proactive problem-solving ensured that the project goals were met, delivering a safer and more efficient corridor for the traveling public.

Engineer