O&G was awarded the contract for Roadway Improvements at Rentschler Field and the building pad preparation for the new Cabela’s retail store in East Hartford Connecticut.

The project consisted of approximately 100,000 cubic yards of earth cut/fill/import material, the installation of over 10,000 linear feet of utility pipe (water, storm, and sanitary), the installation of a 160 linear foot precast concrete bridge, the installation of over 10,000 linear feet of precast concrete and granite curbing and over 60,000 square yards of roadway and sidewalk paving.

The project also consisted of two signalized intersections on site, site roadway lighting, and the reconstruction of Silver Lane at the Roberts Street intersection which leads to the project site.

Engineer